NATA's 2026 changes for NDT and inspection, in plain English.
NATA changed two sets of criteria this year: the move to ISO/IEC 17020:2026 for inspection bodies, and a new NDT annex for laboratories. Both live in PDFs. Here they are restated, with clause numbers, plus free forms to print and fill in.
For owners, Level 3s and quality managers of NATA-accredited NDT and inspection firms, and whoever signs the reports.
The dates that matter
- August 2026
NATA's NDT annex to ISO/IEC 17025 takes effect. PAUT and TOFD software must be validated and version controlled.
SAC 03.3, issued May 2026 - 1 October 2026
Every NATA assessment of an inspection body is now against ISO/IEC 17020:2026.
SAC 10.02 - Your next scheduled visit
Your inspection accreditation is assessed for conversion. You send NATA's Implementation Checklist and evidence beforehand.
SAC 10.02 - 31 March 2029
The transition ends. NATA says bodies that haven't transitioned will have their accreditation suspended.
SAC 10.02
What changed, in three parts
- ISO/IEC 17020:2026
52 clauses to answer before your conversion visit
NATA's Implementation Checklist lists every clause with a new or major change. Risk, contract review, data control and records are the new ground for small bodies.
- NDT annex, May 2026
Your analysis software is now a controlled item
PAUT and TOFD software is validated and version controlled, every update is assessed, CR/DR filters are controlled, and job records name the software and version.
- Clause 6.2.9
If you use the technology, you're responsible for it
The new edition names AI, data processing, augmented reality and remote inspection. It applies to what you use, and NATA says it must be revisited whenever changes could affect outcomes.
Free forms to print
No email needed. Each form turns a NATA requirement into something you can fill in, cites the clause it works from, and says plainly that it isn't a NATA form.
- PDF · 4 pages · A4
The NDT accreditation calendar
Three years of keeping accreditation on one page, from reassessment to reassessment. Then your own names and dates, a transition plan worked back from your visit, and a record for every technology change.
- PDF · 2 pages · A4
ISO/IEC 17020:2026 conversion planner
The 52 new and major clauses on NATA's checklist in 20 groups, with columns for evidence, owner and due date. For planning; you still submit NATA's own checklist.
- PDF · 2 pages · A4
NDT software change record
One page for every update to acquisition, analysis or processing software, before results from the new version go out. Plus a version register for the annual check.
- PDF · 2 pages · A4
NDT job record fields check
Tick off the fields NATA's annex lists for radiography, ultrasonics and electromagnetic testing against your own job sheet, then plan what to change.
Read the detail
- Set the rules
ISO 17020 2026 Changes: Every New and Major Clause on NATA's Checklist, in Plain English
- Set the rules
NATA's 2026 NDT Annex: What Changed for PAUT, TOFD, CR and DR Software
- Set the rules
ISO/IEC 17020:2026, Clause 6.2.9: Why Your Inspection Body Should Write Down Its Position on AI
- Set the rules
If an AI Drafts It and You Sign It: Ten Things an Assessor Is Likely to Ask
- Draw the map
Who Is Allowed to Sign? Authorised Signatories and the Two-Person Problem
- Set the rules
What NATA Has Said About AI in Accredited Facilities, and What It Hasn't
Where we come in
Most of what NATA now asks for is a matter of writing things down: which software touches a result, who accepts a change, how a job travels from request to signed report, and where the Level 3 decides.
That is what we do. We help you set the rules for AI and technology, then draw the map of how your work really runs, so your people, your assessor and any tool you add later are all working from the same page. When NATA or your software changes again, the map is what gets updated.
Questions people ask
- When does my inspection body move to ISO/IEC 17020:2026?
- At your next scheduled NATA assessment after 1 October 2026, or earlier on request as a chargeable variation, according to NATA's transition policy. The transition ends 31 March 2029.
- Does NATA require an AI policy?
- We could find no NATA requirement for an AI policy as such. Clause 6.2.9 of ISO/IEC 17020:2026 makes an inspection body that uses technology, AI included, responsible for it, and a written position is a sensible way to show that.
- What does NATA's NDT annex say about PAUT software?
- That software used for PAUT and TOFD data acquisition and analysis is validated and version controlled, and any update must be traceable and assessed for its impact on inspection performance.
- Is there an ISO/IEC 17025:2025?
- As at 13 November 2026, NATA's ISO/IEC 17025 page describes ISO/IEC 17025:2017 as the current version. The change NDT laboratories got in 2026 was NATA's NDT annex.
- Are these forms from NATA?
- No. They are ours, free to use, and they cite the NATA documents they work from. Always check against NATA's current documents and ask your NATA client coordinator where anything is unclear.
Checked against NATA's published documents on 13 November 2026.
Subfractal is not affiliated with or endorsed by NATA, and nothing here has been reviewed by it. This is general information, not accreditation or legal advice.
